Welcome to our new eshop
truck icon Next-day shipping across Greece for available items
credit cards icon Shop with ease. Up to 36 installments available
package icon Over 120,000 available products
tag icon Large physical store with product exhibition
Παιχνίδι NSW Harvest Days
NSW Harvest Days: A Comprehensive Harvesting Solution NSW Harvest Days is a comprehensive solution designed to enhance the efficiency and sustainability of harvesting operations in New South Wales, Australia. This solution integrates advanced technologies and best practices to ensure that...
More

Παιχνίδι NSW Harvest Days

Product Code: 1136501973
Available in 1 - 3 days
24,91 €
Quantity:
Add
support icon

Need Help? Fill in your details so we can call you immediately!

Description

NSW Harvest Days: A Comprehensive Harvesting Solution

NSW Harvest Days is a comprehensive solution designed to enhance the efficiency and sustainability of harvesting operations in New South Wales, Australia. This solution integrates advanced technologies and best practices to ensure that harvesting is conducted in a manner that maximizes productivity while minimizing environmental impact.

Key Features:

  • Harvest Planning:
    • Harvest Plans: Detailed site-specific instructions for each operation, including site safety plans, operational maps, and seasonal harvesting capability.
    • Consultation: Collaboration with licensees to ensure that harvest plans are tailored to specific needs and conditions.
  • Safety and Compliance:
    • Safety Induction: On-site induction conducted by the Site Foreman (SFO) to ensure that all operators understand the contents of the harvest plan.
    • Plan Compliance: Failure to comply with the harvest plan is strictly monitored and reported to the SFO.
  • Operational Efficiency:
    • Track Width and Spacing: Tracks are designed to minimize damage to retained stands, with specific guidelines for track width (5 meters minimum) and spacing (5.5 meters for cross tracks).
    • Track Grade: Tracks must be safe for use by all harvesting machinery, with maximum slope guidelines based on the harvesting system and ground conditions.
  • Environmental Protection:
    • Buffer Zone: An area of modified harvesting on either side of drainage features, where machinery must not create water channels and minimize soil exposure.
    • Five-Metre Zone: An area of extra protection next to wetlands, rivers, and drainage lines, where no processing or extraction machinery is allowed except where documented in the harvest plan.
  • Post-Harvest Management:
    • By-Product Management: By-products such as limbs, in-field chipper bark, whitewood, or peelings are either sold or distributed along extraction tracks or evenly throughout the forest.
    • DPFAs: Contains two zones – a buffer zone and a five-metre zone – to protect drainage features and wetlands.
  • Floodplain Harvesting Measurement:
    • Metering Equipment: Water users must install telemetered metering equipment to measure floodplain harvesting accurately, ensuring compliance with licensed volumes and legal limits.
  • Precision Agriculture:
    • Yield Monitoring: Real-time monitoring of crop yield and moisture data to determine if additional drying is necessary, using advanced precision agriculture tools.
  • Regulatory Compliance:
    • Standards and Guidelines: Compliance with Minister’s specifications for metering equipment installation and validation, ensuring accurate measurement of floodplain harvesting.

The NSW Harvest Days solution is designed to provide a holistic approach to harvesting, ensuring not only operational efficiency but also environmental sustainability and regulatory compliance. While it does not appear to be a specific product with an EAN code or MPN, it represents a comprehensive framework for managing and optimizing harvesting operations in New South Wales.

Technical Specifications
Ratings
24,91 €
Add